min9821 wrote:
40幾億是一堆子合約的總金額。M1A2合約就是11億。
看五毛大言不慚, 又立馬被打臉的德性, 實在是很舒壓.

DSCA賣給波蘭的M1A2SEPv3, 總報價60億鎂. 假設波蘭很會殺價, 假設拜登感謝波蘭捐一堆坦克給烏克蘭, 將合約內容不變, 總價一刀砍成47.5億鎂好了.

那麼47.5億鎂的軍購內容如下 :
250輛M1A2SEPv3
250組 AN/VLQ-12反IED
26台M88A2裝甲救濟車
17台M1110架橋車
276挺M2五零機槍
500挺M240C 三零機槍
15組備用AGT 1500引擎
9168發M865練習彈
4592發M1002砲彈
13920發M830A1砲彈
6960發XM1147砲彈
五毛說第一項250輛M1A2SEPv3要價11億鎂, 所以後面十項要價36.5億鎂.

你以為波蘭政府和五毛一樣蠢嗎??

========
WASHINGTON, February 17, 2022 - The State Department has made a determination approving a possible Foreign Military Sale to the Government of Poland of M1A2 SEPv3 Main Battle Tanks and related equipment for an estimated cost of $6.0 billion. The Defense Security Cooperation Agency delivered the required certification notifying Congress of this possible sale today.
The Government of Poland has requested to buy two hundred fifty (250) M1A2SEPv3 Abrams Main Battle tanks; two hundred fifty (250) AN/VLQ-12 CREW Duke counter-IED systems; twenty-six (26) M88A2 HERCULES Combat Recovery vehicles; seventeen (17) M1110 joint assault bridges; two hundred seventy-six (276) M2 .50 caliber machine guns; five hundred (500) M240C 7.62mm machine guns; fifteen (15) AGT1500 gas turbine engines; nine thousand one hundred sixty-eight (9,168) 120mm M865 Target Practice, Cone Stabilized, Discarding Sabot - Tracer (TPCSDS-T) cartridges; four thousand five hundred ninety-two (4,592) 120mm M1002 Target Practice Multipurpose Tracer (TPMP-T) projectiles; thirteen thousand nine hundred twenty (13,920) 120mm M830A1 High Explosive Anti-Tank (HEAT) TP-T cartridges; and six thousand nine hundred sixty (6,960) 120mm XM1147 High Explosive multipurpose tracers. Also included are forward repair systems; trailer mounted generators; Common Remote Operated Weapons Station Low Profile (CROWS-LP); communications equipment; GPS receivers; ammunition; spare and repair parts; Special Tools and Test Equipment (STTE); technical manuals and publications; maintenance trainers; gunnery training systems; tank driver’s trainers; new equipment training; U.S. Government and contractor technical, engineering, and logistics personnel services; and other related elements of logistics and program support. The total estimated program cost is $6.0 billion.
























































































